by progadmin | Jun 27, 2013 | Cabling, Rack and Tray Cabling Structure, Solutions
The process of installing a patch panel onto a wall begins with the preparing the wall to hold the rack. Most offices have drywall walls. Sometimes the walls are concrete if they lie along the structural boundaries of the building. This installation involved mounting...
by progadmin | Jun 4, 2013 | Cabling, News, Solutions
This project involved installation of 28 double drops into two 48-port patch panels. Each wall plate has two connections with one dedicated to data and the other dedicated to voice. Price Benowitz has a lovely office at 409 7th Street, NW. The building is historic but...