by progadmin | Jun 27, 2013 | Cabling, Rack and Tray Cabling Structure, Solutions
The process of installing a patch panel onto a wall begins with the preparing the wall to hold the rack. Most offices have drywall walls. Sometimes the walls are concrete if they lie along the structural boundaries of the building. This installation involved mounting...
by progadmin | Feb 19, 2008 | Solutions
After replacing the main UPS here at the office this past weekend , I began to wonder if there were a way to shutdown more than 1 PC connected to the UPS. As most of you know, a UPS will come with a communications port to let the PC know the status of the UPS. This is...